Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0031 Section 02R

Michael Kilgore

Cost: $8.9 million
Client: PennDOT Engineering District 12-0
Contact: Mr. William Oshnack (724-439-7321)
Project Letting - 2005
Project Completion - August 2007


S.R. 0031, Section 02R (Three Mile Hill); Fayette and Westmoreland Counties - This project includes widening to add a downhill truck lane, resurfacing, shoulders, drainage, median barrier, and guide rail.

 

S.R. 0022 Section 032

Michael Kilgore

Cost: $1.6 million
Project Length: Approximately 510 Feet
Client: PennDOT Engineering District 9-0
Contact: Bill Ratchford and Nick Vivian (814-696-7197)

Bridge Superstructure Replacement - The project included a two span (106’ – 6” c/c brgs.) Continuous Composite Galvanized Steel I-Beam bridge over the Beaverdam Branch of Juniata River. The project included approximately 400 feet of roadway approach work and utilized a phased construction sequence to maintain traffic throughout construction.
 

S.R. 0151 Section 016

Michael Kilgore

Cost: $1.96 million
Project Length: 324.19 feet
Client: Engineering District 11-0
Contact: Mr. Elwood Balog, P.E. (412-429-4877)

Bocktown Road Bridge Replacement - This project included a single span (116.52’ c/c brgs.) prestressed concrete adjacent box beam bridge over Raccoon Creek and a pile and plank retaining wall (207.67’). The bridge replacement design was coordinated with the approach roadway reconstruction design performed by Engineering District 11-0.