S.R. 0022 Section 032

Michael Kilgore

Cost: $1.6 million
Project Length: Approximately 510 Feet
Client: PennDOT Engineering District 9-0
Contact: Bill Ratchford and Nick Vivian (814-696-7197)

Bridge Superstructure Replacement - The project included a two span (106’ – 6” c/c brgs.) Continuous Composite Galvanized Steel I-Beam bridge over the Beaverdam Branch of Juniata River. The project included approximately 400 feet of roadway approach work and utilized a phased construction sequence to maintain traffic throughout construction.
 

S.R. 2014 Section 001

Michael Kilgore

Price: $1.73 Million
Client: Engineering District 9-0
Contact: Bill Ratchford (814-696-7197)

Bridge Replacement over the Beaverdam Branch of the Juniata River. This project includes a two (2) span (136’-0 ¾” overall c/c brgs.) precast concrete adjacent box beam bridge on a slight curve. The bridge included a pedestrian facility and architectural surface treatments to mimic a nearby park facility. The project also included approximately 490’ of approach roadway work.