Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0018 Section Y10/Z10

Michael Kilgore

Cost: $2.42 Mil.
Client: Engineering District 12-0
Contact: Troy Pritts, P.E.(724-415-2401)
Project Letting - March 19, 2007

This project was the emergency replacement of two (2) structures; one (1) carrying S.R. 0018 over Bates Fork Creek and one (1) over Browns Run and included approach roadway work.

S.R. 1009 Section A01

Michael Kilgore


 Cost: $482,200
Project Length: 0.133 Mile
Client: PennDOT Engineering District 2-0
Contact: Mr. Erik Brown, P.E. (814-768-0722)

Drainage Structure Replacement - This project included a box culvert replacement carrying S.R. 1009 over Ludington Run utilizing a temporary roadway. 

 

S.R. 0022 Section 024

Michael Kilgore

Cost: $1.93 million
Client: PennDOT Engineering District 9-0
Contact: Mr. Bill Ratchford (814-696-7159)

Duncansville Bridge - This project includes a single span (68.0’ c/c brgs.) precast concrete adjacent box beam bridge over Blair Gap Run. The project also includes minor approach roadway reconstruction, two waterline replacements, complex phasing and utility phasing requirements in order to maintain traffic during construction.