Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0322 Section C01

Michael Kilgore

Cost: 18 Million
Project Length: 12-Miles
Client: PennDOT Engineering District 2-0
Contact: Mr. Erik Brown, P.E. (814-768-0722)

(Roadway and Bridge Reconstruction) - This project included a Five Span (Overall span length – 344’-4”) Continuous Composite Prestressed Concrete Bridge carrying S.R. 0153 over S.R. 0080 (I-80); a single (49’-8 1/2”) Span Composite Prestressed Concrete Bridge carrying S.R. 0322 over Moose Creek; and a single (50’-7 5/8”) Span Composite Prestressed Concrete Bridge carrying S.R. 0322 over Moose Creek. It also included the reconstruction of a major Interchange between S.R. 0080 (I-80) with S.R. 0153. 

S.R. 2007 Section 001

Michael Kilgore

Before

After


 Cost: $1.29 million
Client: PennDOT Engineering District 9-0
Contact: Mr. Brad Brumbaugh (814-696-7174)

Oldtown Run Bridge Replacement - This project included a single span (73.68' c/c brgs.) precast concrete spread box beam bridge over Oldtown Run. The project also included 1,465' of new off-line approach roadway construction. 

 

S.R. 3007 Section 001

Michael Kilgore

Cost: $916,000
Project Length: 1,012 feet
Client: Engineering District 9-0
Contact: Monica Farabaugh (814-696-7160)

Intersection Improvement - This project consists of reconfiguration of an offset intersection (Goucher Street and Harshberger Street) and addition of turning lanes. This project also includes one (1) new traffic signal. The total length of roadway widening, overlay, and/or reconstruction is 1,012’.