Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Composite Prestressed Concrete Bridge

S.R. 0322 Section C01

Michael Kilgore

Cost: 18 Million
Project Length: 12-Miles
Client: PennDOT Engineering District 2-0
Contact: Mr. Erik Brown, P.E. (814-768-0722)

(Roadway and Bridge Reconstruction) - This project included a Five Span (Overall span length – 344’-4”) Continuous Composite Prestressed Concrete Bridge carrying S.R. 0153 over S.R. 0080 (I-80); a single (49’-8 1/2”) Span Composite Prestressed Concrete Bridge carrying S.R. 0322 over Moose Creek; and a single (50’-7 5/8”) Span Composite Prestressed Concrete Bridge carrying S.R. 0322 over Moose Creek. It also included the reconstruction of a major Interchange between S.R. 0080 (I-80) with S.R. 0153. 

S.R. 0188, Section F10

Michael Kilgore

Project Cost: $1.2 Million
Client: Engineering District 12-0
Contact: Mr. William Oshnack (724-439-7321)
Project Letting - 1998

(Bridge Replacement) - Greene County -  This project included a single span (span length 68’-7”) Composite Prestressed Concrete Bridge carrying S.R. 0188 over Conrail tracks.  Roadway approach adjustments were minimal. 

S.R. 0136, Section E00

Michael Kilgore

(Bridge Replacement) - Westmoreland County - $1.0 Mil.  This project included a Single Span (Span length 119’) Composite Prestressed Concrete Bridge which carries S.R. 0136 over Sewickley Creek.  The entire length of the project was 453 feet, 0.086 mile.  Roadway approach adjustments were minimal.