Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0085 Section 150

Michael Kilgore

Cost: $1.0 Mil.
Project Length:1,285 feet
Client: PennDOT Engineering District 10-0
Contact: Mark Rozich, P.E. (724-357-2852)

Bridge Replacement and Roadway Adjustments - This project included a Two-Span (Overall span length - 92 feet) Continuous Composite Prestressed Concrete Bridge carrying S.R. 0085 over Cowanshannock Creek.

Final Project 9/27/2005

S.R. 3052, Section B01

Michael Kilgore

Ambridge-Aliquippa Bridge Needs Analysis - Allegheny and Beaver Counties - This project included the investigation, documentation, and approval of the transportation needs for the Ambridge/ Aliquippa Bridge Needs Study.  The Needs Study identified the transportation deficiencies of the existing roadway network between the communities of the project area and defined what components or operational characteristics of the existing transportation system were deficient and required improvement.  The needs were established based upon traffic volumes, existing capacity versus travel demand, safety, and network demand for transriver travel.  The work involved identification of transportation facilities, characteristics and deficiencies collection and analysis of existing traffic data and design year forecasts.  This data was used to determine highway segment and intersection capacity and to project the degree of existing and future traffic congestion based on level of service analysis.  Select link analysis was used to forecast transriver travel demand in the study area.  This travel demand was analyzed with respect to capacity, safety and geometric deficiencies, traffic congestion, and accessibility to define existing and future transportation problems and needs.

S.R. 0008, Section A03

Michael Kilgore

Project Cost: $6.5 million
Client: Engineering District 1-0
Contact: Mr. Rod Fasenmyer, (814-678-7369)
Project Letting February 2010

Venango County - SPK provided preliminary and final design engineering services for a 2.25 mile roadway realignment and widening project south of Titusville, PA. SPK developed a preliminary design which improved the horizontal and vertical alignment to meet current design speed criteria while minimizing cost and right-of-way impacts. The final design presented unique traffic control challenges of maintaining mainline traffic while constructing the roadway in half-widths. SPK completed a comprehensive right-of-way plan, utility coordination, integral abutment bridge design, drainage, E&S, stormwater, environmental permits and traffic control plan as part of the PS&E package. SPK worked closely with the District in coordinating public and emergency official involvement regarding the project schedule and access issues.