Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0068 Section 153

Michael Kilgore

Cost: $3.472 Mil.
Client: PennDOT District 10-0
Ms. Alicia Kavulic (724-357-7614)
Project Letting - 2010

This project consisted of replacing five (5) structures; four (4) on S.R. 0068 and one (1) on S.R. 4007. The project included a combined 1,739’ of approach roadway reconstruction. The four (4) structures on S.R. 0068 were box culverts and were replaced via phased construction. The structure on S.R. 4007 was a Con-Span structure and was replaced utilizing a limited-duration detour. SPK developed the conceptual plans and specifications for a Department Design-Build project. SPK also provided design review and construction consultation on the project.

Final Project 9/27/2012

Before Project 12/3/08

Before Project 12/3/08

S.R. 0064, Section A01

Michael Kilgore

Project Cost: $1.83 Million (Current Estimate)
Client: Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)
Project Letting - Summer 2015

The project consists of the replacement of the existing two-span reinforced concrete T-beam bridge that carries S.R. 0064 over Fishing Creek at segment 0020, offset 1070. A single-span adjacent box beam bridge with conventional abutments is proposed. Minimal roadway approach work will be included for approximately 160 feet on the western approach and 190 feet on the eastern approach. Traffic control will consist of half-width phased construction, and single lane traffic controlled with temporary signals. Client: Engineering District 2-0; Contact: Mr. Mark Kucherer, P.E. (814-765-0440); Project Letting - Summer 2015.

S.R. 0120 Section A04

Michael Kilgore

Cost: $1.07 million
Project Length: 0.057 Mile
Client: PennDOT Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)

Paddy Run Bridge Replacement - This project includes a single span (51'-6"' c/c brgs.)
precast concrete spread box beam bridge over Paddy Run. The project also includes 450' of
approach roadway reconstruction.