Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 1054 Section F10/H10

Michael Kilgore

Cost: $1.275 Mil.
Client: PennDOT Engineering District 12-0
Project Letting - 2009


This project consisted of replacing two structures; the first a box culvert (14’ span) over an Un-named Tributary to Back Creek and the second, a bridge (45.5’ span) over Back Creek. The project included a combined 700’ of approach roadway reconstruction. SPK developed the conceptual plans and specifications for a Department Design-Build project. SPK also provided design review and construction consultation on the project. 

S.R. 0188, Section F10

Michael Kilgore

Project Cost: $1.2 Million
Client: Engineering District 12-0
Contact: Mr. William Oshnack (724-439-7321)
Project Letting - 1998

(Bridge Replacement) - Greene County -  This project included a single span (span length 68’-7”) Composite Prestressed Concrete Bridge carrying S.R. 0188 over Conrail tracks.  Roadway approach adjustments were minimal. 

S.R. 0051, Section A40

Michael Kilgore

Project Length: 4.56 Miles
Client: Engineering District 11-0
Contact: Bob Collins, P.E. (412-429-4926)

Allegheny/Westmoreland County Line to the Elizabeth Bridge - Roadway Restoration Project - Allegheny County - This project included 4.56 miles of concrete pavement patching.  Also included was the bridge deck overlay of the S.R. 0051 Northbound Lane over Hayden Run.  Notice to Proceed was issued on August 8, 1997 and the PS&E was delivered on March 20, 1998.