Ashe Clearfield Golf Outing
Michael Kilgore
SPK is proudly supporting Ashe Clearfield at their golf outing today!
Use the form on the right to contact us.
You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right.
123 Street Avenue, City Town, 99999
(123) 555-6789
email@address.com
You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.
SPK Engineering's past projects
SPK is proudly supporting Ashe Clearfield at their golf outing today!
Congratulations to Ally Baird!! Installed as ASHE President of SWPenn Section for 2025-2026. Pictured here with ASHE National President Don Di Zuzio.
Cost: $16.6 million
Client: PennDOT District 10-0
Project Length - 0.851 miles
Project Letting: September 2021
Roadway Widening and Realignment - Armstrong County - The project consisted of widening and realignment of a section of S.R. 0028, known locally as the Goheenville Dip. The alignment modifications included both horizontal and vertical adjustments. The project also included three structure replacements; a box culvert, a pipe culvert, and a two-span (240’ overall span) continuous prestressed concrete PA Bulb-Tee Bridge carrying S.R. 0028 over Laurel Run. Traffic control, due to the grade changes, was a critical design element for this corridor improvement project.