S.R. 0028 Section 112
Michael Kilgore
Cost: $16.6 million
Client: PennDOT District 10-0
Project Length - 0.851 miles
Project Letting: September 2021
Roadway Widening and Realignment - Armstrong County - The project consisted of widening and realignment of a section of S.R. 0028, known locally as the Goheenville Dip. The alignment modifications included both horizontal and vertical adjustments. The project also included three structure replacements; a box culvert, a pipe culvert, and a two-span (240’ overall span) continuous prestressed concrete PA Bulb-Tee Bridge carrying S.R. 0028 over Laurel Run. Traffic control, due to the grade changes, was a critical design element for this corridor improvement project.