Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 4099, Section EMR

Michael Kilgore

$2.204 million
Client: PennDOT District 12-0
Contact: Gary Ferrari (gferrari@pa.gov)
Construction Start: May 4, 2020
Construction finished: October 15th, 2020

East Vandergrift Emergency Slide - Westmoreland County - This project was the emergency stabilization of the steep S.R. 4099 roadway/sidewalk. The slope and sidewalk had been a recurring maintenance issue for many years. SPK along with EI prepared an emergency construction plan utilizing a 650’ long staggered dowel system developed by EI. The system is comprised of a drilled concrete-filled casing capped with a cast-in-place concrete cap which doubled as the new sidewalk. Due to the narrow roadway, traffic was detoured throughout the duration of construction. Also, due to the emergency nature of the project, the contractor was immediately brought on board to collaborate on means and methods, material procurement, access, etc. The Advanced Notice to Proceed was issued March 13, 2020 and the Final PS&E was developed April, 29, 2020. The project is completed and was opened back up to traffic on October 15th, 2020.

S.R. 3020, Section 350

Michael Kilgore

Final

Final

Cost: $887,020
Client: PennDOT District 10-0
Contact: Eric Buchan, P.E. (724-357-2971)
Project Letting: October 2016

Alum Rock Bridge - This project consisted of a 55’ span total replacement bridge over Turkey Run in Richland Township, Clarion County. The SPK team was retained to expeditiously complete the Final Design initiated by others.

S.R. 3006, Section 350 (Catfish Run Bridge)

Michael Kilgore

During

During

Cost: $641,400
Client: PennDOT District 10-0
Jason Layman (724-357-7614)
Project Letting: May 2018

Superstructure Replacement - Clarion County - This project consisted of the removal of an existing steel through-girder superstructure and installation of a multi-steel girder superstructure (47’ span). The bridge work also included partial removal of the existing stone abutments and reconstruction of concrete caps to accommodate the new superstructure. There is 345’ of approach roadway reconstruction included.