Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0119, Section 462

Michael Kilgore

After

After

Before

Before

After

After

After

After

Cost: $3.78 Million
Client: PennDOT District 10-0
Contact: Mr. Jason Layman (724-357-7614)
Project Letting: August 2015

Blais Bridges - Dual Bridge Superstructure Replacements - Indiana County -  This project consists of the replacement of the existing dual bridge superstructures with single span steel plate girder spans (97.5’ each). The replacements are facilitated via cross-overs to maintain the S.R. 0119 Limited Access Freeway (6,600 ADT), establishing the 4,500’ project limits.

S.R. 2002 Section 250

Michael Kilgore

After

After

After

After

After

After

Cost: - $1.663 Million
Client: PennDOT District 10-0
Contact: Ms. Melanie Percha, P.E. (724-357-4804)
Project Letting: October 2015.

(Herman Road Bridge) - Butler County - This project included the phased replacement of a deteriorated two-span non-composite adjacent box beam bridge over Coal Run with a single span shallow fabricated structural steel bridge (73.5’ c-c brgs.). The project also included 505’ of approach roadway construction and pedestrian facilities.

Henry Mancini Bridge - S.R. 3050, Section B01

Michael Kilgore

Cost: $3.2 Million
Client: Engineering District 11-0
Contact: Bob Collins, P.E. (412-429-4928)
Project Letting - August 2015

Beaver County -  This project is the preservation of an existing nine-span steel girder bridge carrying a local road (owned by the City of Aliquippa) over S.R. 0051 NB, tracks of CSX Railroad, and various local streets. The preservation activities include bearing replacement, concrete repairs, superstructure retrofits to convert several simple spans to continuous spans, and partial deck hydrodemolition and latex overlay.