Projects

SPK Engineering's past projects

S.R. 2017 Section B10

Michael Kilgore


 Cost: $592,000
Client: PennDOT Engineering District 12-0
Contact: Bill Oshnack (724-439-7321)

Structure Replacement over a Tributary of Sewickley Creek - This project includes replacing a single span reinforced concrete slab bridge with a 9’-0” x 6’-6” precast reinforced concrete box culvert. The project also included approximately 200’ of approach roadway work. 

S.R. 4003 Section 003

Michael Kilgore

Before

After

Cost: $1.2 million
Client: PennDOT Engineering District 9-0
Project Manager - Mrs. Melissa Irwin, E.I.T. (814) 696-6858

Mill Run Bridge Replacement - This project consisted of a new replacement single span, concrete spread box beam bridge to carry Broad Avenue (S.R. 4003) over Mill Run in the City of Altoona. The bridge design and traffic control plan were prepared for half-width construction to maintain traffic. The design accounted for the close proximity of two (2) residences and a major signalized intersection adjacent to the ends of the bridge. Additional design considerations included utility coordination to maintain utility lines across the bridge, traffic signal pole foundations in the abutment, ADA ramp design and turn restriction related detours and phasing.

S.R. 0018 Section V10

Michael Kilgore

Before

After

Project Cost: - $1.879 Million
Client: PennDOT District 12-0
Project Letting - 2008

Greene County - This project consisted of replacing a two-span bridge with a two-span (147.1’ overall span) bridge over the South Fork of Tenmile Creek. The project included 575’ of approach roadway reconstruction and was constructed in phases. SPK developed the conceptual plans and specifications for a Department Design-Build project. SPK also provided design review and construction consultation on the project.