SPK Engineering's past projects

S.R. 4049 Section A11

Michael Kilgore

Ribbon Cutting

Cost: $7.52 Mil.
Client - Engineering District 12-0
Contact: James Sisul - 724-439-7379
Project Letting - March 9, 2006

This project included the development of the Design-Build Best Value Contract for the reconstruction of the original bridge carrying S.R. 4049 (North Main Street) over S.R. 0070 in South Strabane Township. The original bridge was a four (4) span prestressed concrete adjacent box beam bridge (273’ overall span). The structure concept presented in the Design-Build contract was a two (2) span prestressed concrete AASHTO I-Beam bridge. The demolition of the original bridge was included in a separate contract. SPK developed preliminary design concepts that contained all construction within the legal Right-of-Way.
 

S.R. 2004 Section A03

Michael Kilgore

Before

After

Cost: $0.655 million
Project Length: .064 Miles
Client: PennDOT Engineering District 2-0
Contact: Mr. Eric Brown, P.E. (814-768-0722)

Duck Run Bridge Replacement - This project includes a single span (50'-0" c/c brgs.) precast concrete spread box beam bridge over Duck Run. The project also includes 290' of approach roadway reconstruction

S.R. 2045, Section B10

Michael Kilgore

During Construction

During Construction

Project Cost:  $346,000
Client: Donegal Construction (Design-Build Contractor)/Engineering District 12-0 (Owner)
Contact: Ron Holsopple (Contractor - 724-423-7500 x 210)
Bill Oshnack (PennDOT - 724-439-7321)

Structure Replacement over Twomile Run - Westmoreland County - This project included the replacement of a single span steel bridge with a single span prestressed concrete spread box beam integral abutment bridge (44’ c-c brgs.). The project also included 215 LF of approach roadway work.