Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 3113 Section BR1

Michael Kilgore

Before

After

Ferncliff Drive Bridge Emergency Superstructure Replacement and Rehabilitation - This project included the
phased removal and reconstruction of a collision-damaged bridge over Interstate 70.  

 

S.R. 0160 Section 014

Michael Kilgore

Cost: $1.23 million
Project Length: 2,130'
Client: PennDOT Engineering District 9-0
Contact: Mr. Dave Wolfhope, P.E. (814-696-7196)

Two Culvert Replacements - This project included two precast concrete box culverts; 15'-0" x 10'-0" and 20'-0" x 12'-0" for S.R. 0160 over a Tributary to Boone Run and T.R. 542 over Boone Run respectively. The project also included roadway reconstruction lengths of 1,007' and 1,123' for S.R. 0160 and T.R. 542 respectively.