Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 4019 Section 01S

Michael Kilgore


 Cost: $1.05 million
Project Length: 0.598 Miles
Client: PennDOT Engineering District 9-0
Contact: Mr. Dave Wolfhope, P.E. (814-696-7196)

Safety and Mobility Initiative (SAMI) Project - This project included widening of S.R. 4019 and improvements to two (2) existing “T” signalized intersections.  

S.R. 0018 Section A01

Michael Kilgore

Cost: $11.8 Million
Project Length:2.73 Miles
Client: Engineering District 1-0
Contact: Ms. Jeanette Uhl, P.E. 814-678-7084

This project consisted of widening S.R. 0018 (North Hermitage Road) from two lanes to five lanes. Five signalized intersections were upgraded and one new traffic signal installed at Shenango Valley Mall/Hermitage Middle School entrance. 
 

 

S.R. 1025 Section B00

Michael Kilgore

Cost: $1.87 million
Client: PennDOT Engineering District 1-0
Contact: Ms. Jeanette Uhl, P.E. 814-678-7084

Grant Street Bridge Replacement - This project included the replacement of a single
span thru-truss with a two span (63.17 m overall span) prestressed concrete adjacent box
beam bridge over French Creek. The project also included 0.259 km of approach roadway reconstruction.