Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0869 Section 002

Michael Kilgore

Cost: $825,000
Project Length: 562 feet
Client: PennDOT Engineering District 9-0

Bridge Replacement and Approach Adjustments - This project included a Two-Span (Overall span length -101 feet) Continuous Composite Prestressed Concrete Bridge carrying S.R. 0869 over Bobs Creek.

S.R. 0019 Section A01/A02

Michael Kilgore

Cost: $3.6 million
Project Length: 1.35 Miles
Client: PennDOT Engineering District 1-0
(Peach Street) Roadway Improvements (5 Intersections) -This project consisted of widening S.R. 0019 to accommodate a fifth center turning lane. It was located in a highly commercialized congested area. The project also included the design of a coordinated signal system (Six 6 signals).