Projects

SPK Engineering's past projects

S.R. 2025 Section 155

Michael Kilgore

Cost: $1.87 Million
Project Length: 0.317 Mile
Client: PennDOT Engineering District 10-0
Contact: Ms. Melanie Percha (724-357-4804)
Project Letting - 1999

(Garretts Run) - Roadway Reconstruction and Structure Replacement - This project consisted of reconstruction of a Major Collector facility and three (3) single span (51.5’, 54.5’, & 47.0’ spans) Prestressed Concrete Spread Box Beam Bridges. Also included was the reconstruction of 0.07 mile of a Township Road.

S.R. 0819 Section F10

Michael Kilgore

Cost: $0.9 million
Client: PennDOT Engineering District 12-0
Contact Mr. Barry Lyons, P.E. (724-439-7336)
Project Letting - 2009


Buffalo Creek Bridge Replacement - This project consisted of replacing the single span concrete T-Beam bridge with a single span 22’ precast concrete spread box beam bridge over Buffalo Creek. This project was immediately adjacent to a sensitive historic structure and included aesthetic treatments as mitigation. 

 

S.R. 0019 Section G10 Phoebe Run

Michael Kilgore

Cost: $1.97 Million
Client: PennDOT Engineering District 12-0
Contact: Mr. Patrick Richter, P.E. (724-439-7237)


Two Bridge Replacements - Greene County - This project includes the expedited replacement of two substandard bridges carrying S.R. 0019 over Whiteley Creek and Dyers Fork; the replacement spans are 41.5' and 63.0' respectively. The S.R. 0019 upgrades are needed to provide an alternate route for Interstate 79 traffic due to predicted mining subsidence.