Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 1009 Section F10

Michael Kilgore

IMG_0492_stitch.jpg
IMG_0451_stitch.jpg
Before

Before

IMG_0455.jpg
 

Cost: $2.54 million
Client: PennDOT District 12-0
Contact: James Sisul, P.E. (jsisul@pa.gov)
Project Letting: April 30, 2020

S.R. 1009, Section F10 (ECMS #30687) - Washington County - This project was the replacement of a closed spandrel arch with a modular steel girder/precast concrete deck/precast abutments, wingwalls, and approach slabs. Due to the type and condition of the existing arch, and the critical nature of the roadway to the community, the project was advanced utilizing Accelerated Bridge Construction (ABC) methods. The new bridge, which includes deep pile foundations, was constructed within a 30 day road closure and detour.  This method of construction minimized impacts to the traveling public and the community of Houston Borough.

S.R. 1004, Section 450

Michael Kilgore

 

Cost: $4.422 million
Client: PennDOT District 10-0
Contact: Jason Layman, P.E. (724-357-7614)
Project Letting: October 24, 2019

Clymer Ramp Bridge Replacement – Indiana County - – This project consisted of the replacement of a four (4) span steel girder bridge carrying S.R. 1004 over S.R. 0119 with a two (2) span (220’ total length) composite/continuous fabricated steel plate girder bridge. The project also included 681’ of approach roadway reconstruction.