Projects

SPK Engineering's past projects

Filtering by Category: District 2

S.R. 0449, Section A02

Michael Kilgore

After

Before

Before

after

after

after

 

Cost: $1.04 million
County: Potter County
Client: PennDOT District 2-0
Contact: Mr. Craig Sattesahn, P.E. (814-765-0678)
Project Letting: January 2015

This project is the replacement of an existing bridge carrying S.R. 0449 (North Brookland Road) over Pine Creek. The replacement structure is a precast concrete box culvert (18’ normal clear span). A temporary roadway and stream crossing are included in the project to maintain traffic during construction. The project also includes 587 LF of roadway reconstruction.

S.R. 0080 Section B09

Michael Kilgore

Project Cost: $43.0 million
Project Length: 7.22 Miles WB 7.29 Miles EB
Client: PennDOT Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)

Interstate Roadway and Bridge Reconstruction - This project includes a Dual Five-Span (Overall span length - 439.5 feet WB/458.0 feet EB) carrying S.R. 0080 WB and EB over S.R. 0220 (Milesburg Interchange); a Dual Three-Span (Overall span length - 274.0 feet WB and EB) carrying S.R. 0080 WB and EB over Bald Eagle Creek; and a Dual Single-Span (Overall span length - 65.2 feet WB/73.0 feet EB) carrying S.R. 0080 WB and EB over S.R. 1006. The project also includes the reconstruction of the Milesburg Interchange (S.R. 0080/S.R. 0220).  

S.R. 0006 Section A02

Michael Kilgore

Cost: $1.48 million
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)
Client: Engineering District 2-0
Project Letting - 2007

US 6/Allegheny River Bridge Replacement  - This project included a single span (63’ c/c brgs.) prestressed concrete spread box beam bridge with integral abutments. The abutments and bridge barrier included a brick architectural surface treatment to complement an adjacent historic building. The project included 280’ of approach roadway reconstruction. The project also included minor intersection and roadway improvements on a local street network in Coudersport to accommodate detoured traffic during construction of the bridge. The detour was comprised partially of a pair of one-way roads in a residential community and included two temporary traffic signals.