Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 2

S.R. 1020 Section A01

Michael Kilgore

Cost: $1.31 million
Client: PennDOT Engineering District 2-0
Contact: Mr. George Uhl (814-765-0480)

Bridge Replacement - Potter County - This project includes a two span (98'-6" c/c brgs.) precast concrete spread box beam bridge over the West Branch of Pine Creek. The project also includes 535' of approach roadway reconstruction.  
 

S.R. 1009 Section A01

Michael Kilgore


 Cost: $482,200
Project Length: 0.133 Mile
Client: PennDOT Engineering District 2-0
Contact: Mr. Erik Brown, P.E. (814-768-0722)

Drainage Structure Replacement - This project included a box culvert replacement carrying S.R. 1009 over Ludington Run utilizing a temporary roadway. 

 

S.R. 3006 Section B01

Michael Kilgore

Cost: $714,000
Project Length: 1,446 LF
Client: PennDOT Engineering District 2-0
Contact: Mr. Erik Brown, P.E. (814-768-0722)

Water Street Relocation Project – This project included the relocation of 1,028 LF of roadway and an intersection improvement with S.R. 3006. The project involved coordination with an adjacent railroad and FEMA. A FEMA Conditional Letter of Map Revision (CLOMR) is currently being prepared for the project.