Projects

SPK Engineering's past projects

S.R. 0065 Section A11

Michael Kilgore

Cost: $1.5 million
Client: Engineering District 11-0
Contact: Mr. John Alvetro (412) 429-5088

Ohio River Boulevard - Widening and Resurfacing - This project consisted of widening Ohio River Boulevard from 40’ to 52’ for use of a proposed center lane. The project also included a traffic signal upgrade as well as drainage and signing/pavement marking improvements. Critical design activities were maintaining access to businesses, utility relocation design, and construction schedule relative to utility on-site relocations.

 

S.R. 0030 Section A15

Michael Kilgore

Cost: $3.97 million
Client: Engineering District 11-0
Contact Mr. Jeffrey Baker (412-429-4900)
Project Letting - 2008

Westinghouse Bridge - This project included the rehabilitation of a five-span (1,524’ overall span) reinforced concrete open spandrel arch bridge carrying S.R. 0030 over Turtle Creek, Braddock Road, several tracks of Norfolk Southern and Union Railroad, and several local streets. The rehabilitation included deck joint replacement, bearing retrofits, concrete repairs, and miscellaneous structure repairs.

 

 

S.R. 0008 Section A40

Michael Kilgore



 Cost: $6.62 million
Client: Engineering District 11-0
Contact Mr. Michael Sokol (412-429-4898)
Project Letting - 2007

RD Fleming Bridge - This project included the rehabilitation of a 27 span (2,784’ overall) mixed steel deck truss/steel multi-girder bridge carrying SR 0008 over the Allegheny River, several tracks of the Pennsylvania Railroad, and several local streets. The rehabilitation included deck joint replacement, barrier reconstruction, concrete repairs, and miscellaneous structure repairs.