Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0022 Section B02

Michael Kilgore

Cost: $44.0 million
Project Length: 4.316 miles
Client: PennDOT Engineering District 12-0
Contact: Mr. Patrick Richter, P.E. (724-430-4499)

Roadway Widening and Reconstruction - This project includes 4.316 miles of widening and
reconstruction of an arterial facility. The project also includes rehabilitation and extension of seven (7) arch structures.   

 

S.R. 0080 Section B09

Michael Kilgore

Project Cost: $43.0 million
Project Length: 7.22 Miles WB 7.29 Miles EB
Client: PennDOT Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)

Interstate Roadway and Bridge Reconstruction - This project includes a Dual Five-Span (Overall span length - 439.5 feet WB/458.0 feet EB) carrying S.R. 0080 WB and EB over S.R. 0220 (Milesburg Interchange); a Dual Three-Span (Overall span length - 274.0 feet WB and EB) carrying S.R. 0080 WB and EB over Bald Eagle Creek; and a Dual Single-Span (Overall span length - 65.2 feet WB/73.0 feet EB) carrying S.R. 0080 WB and EB over S.R. 1006. The project also includes the reconstruction of the Milesburg Interchange (S.R. 0080/S.R. 0220).  

S.R. 0119 Section 496

Michael Kilgore

Cost: $72.0 Mil.
Project Length:14.05 km
Client: PennDOT Engineering District 10-0
Contact: Mark Rozich, P.E.(724-357-2852)

Route 119 South Improvement Project - This project includes 14.05 km of roadway widening, eleven structures, three new signals, a parallel bike trail, and the relocated interchange of S.R. 0119 with S.R. 0022.