Projects

SPK Engineering's past projects

S.R. 3003 Section 001

Michael Kilgore

Before

After

Cost: $1.388 million
Client: PennDOT Engineering District 9-0
Contact: Bill Ratchford

The Poplar Run Bridge was a job designed using the PennDOT BRADD program. The structure length is 80'-0" c-c of brgs, it has a roadway width of 30'-3", it has a skew of 45 degrees and galvanized reinforcing was used in the deck and barriers. It was constructed in 3 months, June to August, to coincide with the summer break from school and eliminate any conflicts with school bus routing.


 

S.R. 0006 Section A02

Michael Kilgore

Cost: $1.48 million
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)
Client: Engineering District 2-0
Project Letting - 2007

US 6/Allegheny River Bridge Replacement  - This project included a single span (63’ c/c brgs.) prestressed concrete spread box beam bridge with integral abutments. The abutments and bridge barrier included a brick architectural surface treatment to complement an adjacent historic building. The project included 280’ of approach roadway reconstruction. The project also included minor intersection and roadway improvements on a local street network in Coudersport to accommodate detoured traffic during construction of the bridge. The detour was comprised partially of a pair of one-way roads in a residential community and included two temporary traffic signals. 

 

S.R. 1020 Section A01

Michael Kilgore

Cost: $1.31 million
Client: PennDOT Engineering District 2-0
Contact: Mr. George Uhl (814-765-0480)

Bridge Replacement - Potter County - This project includes a two span (98'-6" c/c brgs.) precast concrete spread box beam bridge over the West Branch of Pine Creek. The project also includes 535' of approach roadway reconstruction.