Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 1009 Section A01

Michael Kilgore


 Cost: $482,200
Project Length: 0.133 Mile
Client: PennDOT Engineering District 2-0
Contact: Mr. Erik Brown, P.E. (814-768-0722)

Drainage Structure Replacement - This project included a box culvert replacement carrying S.R. 1009 over Ludington Run utilizing a temporary roadway. 

 

S.R. 0022 Section 024

Michael Kilgore

Cost: $1.93 million
Client: PennDOT Engineering District 9-0
Contact: Mr. Bill Ratchford (814-696-7159)

Duncansville Bridge - This project includes a single span (68.0’ c/c brgs.) precast concrete adjacent box beam bridge over Blair Gap Run. The project also includes minor approach roadway reconstruction, two waterline replacements, complex phasing and utility phasing requirements in order to maintain traffic during construction.

 

S.R. 0070 Section N20

Michael Kilgore

Cost: $5.57 million
Project Length: 3,719' (0.704 mile)
Client: Gulisek Construction, LLC
Contact: Mr. Clayton Stahl (724-696-3341)
Project Letting: December 2010

Bridge Replacement - This project is a design-build bridge replacement project. The project included the removal of a single span bridge carrying Interstate 70 (I-70) eastbound and westbound over S.R. 3014. SPK prepared the final construction plans, traffic control plans, and structure plans for the contractor.