Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 1012 Section 001

Michael Kilgore


 Price: $1.43 million
Client: Engineering District 9-0
Contact: James Pruss (814-696-6850)

Clearfield Creek Bridge #2 – Emergency Bridge Replacement over Clearfield Creek - This project included a single span (100’-0” overall c/c brgs.) precast concrete adjacent box beam bridge. The bridge was replaced on an emergency basis due to failure of the existing steel truss from traffic damage. The project also included approximately 675’ of approach roadway work. 

S.R. 0040, Section 108

Michael Kilgore

Project Cost:  $4.0 million
Contact: Mr. James Sisul (724) 439-7379
Project letting - March 2009

West Chestnut Street Widening - Washington County - SPK provided preliminary and final design engineering services for a 1.25 mile widening and resurfacing project through a heavily traveled urban corridor. SPK completed pavement, drainage, retaining wall, sidewalk/ADA and traffic signal design services and coordinated a substantial utility relocation effort. SPK worked closely with the District by leading public and public officials meetings with property owners to address public concerns regarding parking, driveways, right-of-way takes, landscaping and building entry.

S.R. 3006 Section B01

Michael Kilgore

Cost: $714,000
Project Length: 1,446 LF
Client: PennDOT Engineering District 2-0
Contact: Mr. Erik Brown, P.E. (814-768-0722)

Water Street Relocation Project – This project included the relocation of 1,028 LF of roadway and an intersection improvement with S.R. 3006. The project involved coordination with an adjacent railroad and FEMA. A FEMA Conditional Letter of Map Revision (CLOMR) is currently being prepared for the project.