Projects

SPK Engineering's past projects

S.R. 0160 Section 014

Michael Kilgore

Cost: $1.23 million
Project Length: 2,130'
Client: PennDOT Engineering District 9-0
Contact: Mr. Dave Wolfhope, P.E. (814-696-7196)

Two Culvert Replacements - This project included two precast concrete box culverts; 15'-0" x 10'-0" and 20'-0" x 12'-0" for S.R. 0160 over a Tributary to Boone Run and T.R. 542 over Boone Run respectively. The project also included roadway reconstruction lengths of 1,007' and 1,123' for S.R. 0160 and T.R. 542 respectively. 
 

S.R. 4019 Section 01S

Michael Kilgore


 Cost: $1.05 million
Project Length: 0.598 Miles
Client: PennDOT Engineering District 9-0
Contact: Mr. Dave Wolfhope, P.E. (814-696-7196)

Safety and Mobility Initiative (SAMI) Project - This project included widening of S.R. 4019 and improvements to two (2) existing “T” signalized intersections.  

S.R. 0018 Section A01

Michael Kilgore

Cost: $11.8 Million
Project Length:2.73 Miles
Client: Engineering District 1-0
Contact: Ms. Jeanette Uhl, P.E. 814-678-7084

This project consisted of widening S.R. 0018 (North Hermitage Road) from two lanes to five lanes. Five signalized intersections were upgraded and one new traffic signal installed at Shenango Valley Mall/Hermitage Middle School entrance.