Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0819 Section F10

Michael Kilgore

Cost: $0.9 million
Client: PennDOT Engineering District 12-0
Contact Mr. Barry Lyons, P.E. (724-439-7336)
Project Letting - 2009


Buffalo Creek Bridge Replacement - This project consisted of replacing the single span concrete T-Beam bridge with a single span 22’ precast concrete spread box beam bridge over Buffalo Creek. This project was immediately adjacent to a sensitive historic structure and included aesthetic treatments as mitigation. 

 

S.R. 0019 Section G10 Phoebe Run

Michael Kilgore

Cost: $1.97 Million
Client: PennDOT Engineering District 12-0
Contact: Mr. Patrick Richter, P.E. (724-439-7237)


Two Bridge Replacements - Greene County - This project includes the expedited replacement of two substandard bridges carrying S.R. 0019 over Whiteley Creek and Dyers Fork; the replacement spans are 41.5' and 63.0' respectively. The S.R. 0019 upgrades are needed to provide an alternate route for Interstate 79 traffic due to predicted mining subsidence.

S.R. 1042, Section A01

Michael Kilgore

(Alle-Kiski Connector Needs Study) - Allegheny and Westmoreland Counties - This project included the investigation, documentation, and approval of the project needs for the Alle-Kiski Connector Needs Study.  The Needs Study identified and documented the current and projected transportation deficiencies of the existing roadway network between the involved communities of the project area and defined what components or operational characteristics of the existing transportation system are deficient and require improvement.  The needs document provided a guideline for the development and evaluation of alternatives and clearly illustrates the effects of taking no action (no-build alternative).