Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0188 Section A10

Michael Kilgore

Cost: $3.0 million
Client: Engineering District 12-0
Contact: William Oshnack (724-439-7321)
Project Letting: December 2008

Bridge Replacement over South Fork of Tenmile Creek - This project consisted of a single span (125’) P/S box beam replacement bridge, constructed off line to both improve the alignment of S.R. 0188 and permit traffic to be maintained throughout construction on the original bridge. The project included 1,850 LF of approach roadway reconstruction and incorporated sewer line relocation.
 

S.R. 0166 Section N10

Michael Kilgore

Project Cost: $0.822 Million

Fayette County - This project consisted of replacing a single span bridge with a single span (18’ span) culvert over Dunlap Creek. The project included approximately 300’ of approach roadway reconstruction and was constructed in phases. SPK developed the conceptual plans and specifications for a Department Design-Build project. SPK also provided design review and construction consultation on the project.

S.R. 0021 Section J10

Michael Kilgore

Project Cost: $16.2 million
Client: Engineering District 12-0
Barry Lyons (724-439-7336)
Project Letting - June 2014

Fayette County - Four Lane Widening - This project will widen a 1.63 mile highly commercial section of S.R. 0021 from three (3) lanes to five (5) lanes with exclusive left turn lanes at five (5) signalized intersections, three retaining walls, and rehabilitation of a four-span concrete bridge. The project required 60 commercial and residential property acquisitions. Critical design activity is maintaining traffic through the project and ingress/egress to businesses during construction.