Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0021 Section J10

Michael Kilgore

Project Cost: $16.2 million
Client: Engineering District 12-0
Barry Lyons (724-439-7336)
Project Letting - June 2014

Fayette County - Four Lane Widening - This project will widen a 1.63 mile highly commercial section of S.R. 0021 from three (3) lanes to five (5) lanes with exclusive left turn lanes at five (5) signalized intersections, three retaining walls, and rehabilitation of a four-span concrete bridge. The project required 60 commercial and residential property acquisitions. Critical design activity is maintaining traffic through the project and ingress/egress to businesses during construction.

 

S.R. 0022, Section 010

Michael Kilgore

(Cambria County) - Final Needs Study - A study for PennDOT District 9-0 in which the transportation and socioeconomic conditions in the Ebensburg area were examined to determine needed transportation infrastructure improvements. Mr. Piccolomini managed the overall project and budget and designed engineering alternatives. Communications with local government officials and retail property owners was a necessary part of this project.