Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0040 Section L10

Michael Kilgore

Cost: $0.9 million
Client: Engineering District 12-0
Contact: Mr. Barry Lyons, P.E. (724-439-7336)
Project Letting: 2009

Buffalo Creek Bridge Replacement - This project consisted of replacing the single span concrete T-Beam bridge with a single span 22’ precast concrete spread box beam bridge over Buffalo Creek. This project was immediately adjacent to a sensitive historic structure and included aesthetic treatments as mitigation. 
 

S.R. 0022 Section 491

Michael Kilgore

Project Length: 8.0 miles
Client: PennDOT Engineering District 10-0
Contact: Mr. Mark Rozich, P.E. (724-357-2852)
Project Letting - May 2005

This project includes a coordinated design effort with the District Roadway Design Staff. The project includes 8.0 miles of roadway widening, reconstruction, and/or relocation (Penn View - 3.5 miles; Clyde - 4.5 miles).
 

S.R. 0366 Section F01

Michael Kilgore

Project Length: 225'
Client: PennDOT Engineering District 12-0
Contact: Mr. Ron Deems

Camp Joanne Bridge - This project includes a 16'-0" x 8'-0" precast box culvert over an unnamed tributary of Pucketa Creek. The project also includes 225' of approach roadway reconstruction.