SPK Engineering's past projects

S.R. 0051, Section A40

Michael Kilgore

Project Length: 4.56 Miles
Client: Engineering District 11-0
Contact: Bob Collins, P.E. (412-429-4926)

Allegheny/Westmoreland County Line to the Elizabeth Bridge - Roadway Restoration Project - Allegheny County - This project included 4.56 miles of concrete pavement patching.  Also included was the bridge deck overlay of the S.R. 0051 Northbound Lane over Hayden Run.  Notice to Proceed was issued on August 8, 1997 and the PS&E was delivered on March 20, 1998. 

S.R. 0166 Section V10

Michael Kilgore

Project Cost: $1.688 million
Client: Frank Gavlik & Sons, Inc.
Contact: Mr. Robert Gavlik, Jr. (724-239-2411)
Project Letting: December 2010

Bridge Replacement - Fayette County - This project is a design-build bridge replacement project. The project included the removal of a two span bridge carrying S.R. 0166 over Dunlap Creek. The replacement structure is a single span (115’ span) P/S Bulb-Tee Integral Abutment Bridge. SPK prepared the final construction plans, E&S Control plans, and structure plans for the contractor.

S.R. 4006 Section 11R

Michael Kilgore

$3.6 million (estimated construction cost)
Client: Engineering District 12-0
Project Manager - Mr. Barry Lyons (724-439-7336)
Project Letting - To be determined

New Salem Road - Widening and Resurfacing - Fayette County -  This project consists of widening and resurfacing to provide two through lanes in each direction on S.R. 4006 (New Salem Road), additional lanes on the intersecting Matthew Drive approaches, and improvements to the drainage, signing and pavement markings and traffic signals. Construction of a parking lot to mitigate impacts to an adjacent business will also be part of the project. Critical design activity is maintaining traffic through the project and ingress/egress to businesses during construction.