Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Meadville Interchange

S.R. 0079 Section A06

Michael Kilgore

Cost: $26.3 million
Client: PennDOT Engineering District 1-0
Contact: Rod Fasenmyer - 814-678-7369

Meadville Interchange Reconstruction Project - Originally a teaming effort with the District 1-0 Design Unit performing the roadway design with the SPK team performing all the structure design activities, evolved into a roadway design-build contract that was prepared by SPK. The design-build package included the final design plans for the mainline bridges (two (2) - 223’ single-span steel plate girder bridges), extension and/or repair of three (3) concrete box culverts, eight (8) overhead sign structures, and the approved Design Field View plans for the mainline and ramp reconstruction. The project also included water quality features in the in-fields that were coordinated and designed by the Center for Economic and Environmental Development (CEED) in cooperation with Allegheny College. The project was closely coordinated with the District who performed the Line & Grade Studies and was delivered in less than twelve (12) months.