Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 2030 Section F10

Michael Kilgore

A66A1111Bs.jpg
A66A1136Bs.jpg

Project Cost: $1.1 Million
Client: PennDOT Engineering District 12-0
Contact: Mr. James Sisul (724-439-7379)
Project Letting: March 2019
Construction Completed: October 2019

SR 2030, Section F10 (California Drive over Gorby Run) – This project involved the replacement of the existing single span steel girder bridge with the new precast reinforced concrete rigid frame. Roadway geometry has now been improved along with intersection re-alignment at SR 2030 and North California Drive. Additionally, intersection sight distance within the project area has been improved. Traffic was maintained throughout construction via detour.