S.R. 0166 Section S10

Michael Kilgore

Cost: $1.55 Mil.
Client: PennDOT District 12-0
Contact: Mr. Troy Pritts, P.E. (724-415-2401)
Project Letting: 2008

This project consisted of replacing a two-span bridge with a single span (77.4’ span) bridge over Dunlap Creek. The project included 607’ of approach roadway reconstruction and was constructed in phases. SPK developed the conceptual plans and specifications for a Department Design-Build project. SPK also provided design review and construction consultation on the project. 

 

S.R. 0031 Section 02R

Michael Kilgore

Cost: $8.9 million
Client: PennDOT Engineering District 12-0
Contact: Mr. William Oshnack (724-439-7321)
Project Letting - 2005
Project Completion - August 2007


S.R. 0031, Section 02R (Three Mile Hill); Fayette and Westmoreland Counties - This project includes widening to add a downhill truck lane, resurfacing, shoulders, drainage, median barrier, and guide rail.

 

S.R. 0018 Section Y10/Z10

Michael Kilgore

Cost: $2.42 Mil.
Client: Engineering District 12-0
Contact: Troy Pritts, P.E.(724-415-2401)
Project Letting - March 19, 2007

This project was the emergency replacement of two (2) structures; one (1) carrying S.R. 0018 over Bates Fork Creek and one (1) over Browns Run and included approach roadway work.