Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

S.R. 0381 Section C10

Michael Kilgore


 Cost: $2.7 Million
Client: PennDOT Engineering District 12-0

Meadow Run Bridge Replacement and Roadway Improvements - This project included a Three-Span Continuous Composite Prestressed Concrete Bridge. It also included 1,000 feet of roadway approach and a connection to existing S.R. 2019. The structure was constructed in half-widths so as to maintain traffic at all times.

 

S.R. 0019 Section 107

Michael Kilgore

Cost: $1.76 Million
Project Length: 2,475' (0.469 mile)
Client: PennDOT Engineering District 12-0
Contact: Mr. Jerry Bendo (Retired)

S.R. 0019, Section 107 - Safety and Mobility Initiative (SAMI) Project - This project consisted of widening S.R. 0019 (Murtland Avenue), upgrades to two (2) signalized intersections, and one (1) new traffic signal at Linn Avenue/S.R. 9103 (Jughandle).