S.R. 1026 Section H01
Michael Kilgore
Client: PennDOT Engineering District 12-0
Contact Person: Ron Deems (Retired)
Roadway Improvements with Three Pile and Plank Retaining Walls
Use the form on the right to contact us.
You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right.
123 Street Avenue, City Town, 99999
(123) 555-6789
email@address.com
You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.
SPK Engineering's past projects
Client: PennDOT Engineering District 12-0
Contact Person: Ron Deems (Retired)
Roadway Improvements with Three Pile and Plank Retaining Walls
Cost: $1.97 Million
Client: PennDOT Engineering District 12-0
Contact: Mr. Patrick Richter, P.E. (724-439-7237)
Two Bridge Replacements - Greene County - This project includes the expedited replacement of two substandard bridges carrying S.R. 0019 over Whiteley Creek and Dyers Fork; the replacement spans are 41.5' and 63.0' respectively. The S.R. 0019 upgrades are needed to provide an alternate route for Interstate 79 traffic due to predicted mining subsidence.
Cost: $1.97 Million
Client: PennDOT Engineering District 12-0
Contact: Mr. Patrick Richter, P.E. (724-439-7237)
Two Bridge Replacements - Greene County - This project includes the expedited replacement of two substandard bridges carrying S.R. 0019 over Whiteley Creek and Dyers Fork; the replacement spans are 41.5' and 63.0' respectively. The S.R. 0019 upgrades are needed to provide an alternate route for Interstate 79 traffic due to predicted mining subsidence.