Links - SPK Engineering Careers - SPK Engineering Contacts - SPK Engineering Staff - SPK Engineering Design - SPK Engineering About - SPK Engineering Home - SPK Engineering
SPK Engineering

SPK Engineering

SPK Engineering SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering





Cost: $1.5 million
Client: PennDOT Engineering District 12-0
Contact: Mr. Jerry Bendo (724-439-7377)

Pigeon Creek Bridge Replacement - This project included a two span (125.32' overall span) prestressed
concrete spread box beam bridge over Pigeon Creek. The project also includes was 1,225' of approach roadway reconstruction.

BACK