Links - SPK Engineering Careers - SPK Engineering Contacts - SPK Engineering Staff - SPK Engineering Design - SPK Engineering About - SPK Engineering Home - SPK Engineering
SPK Engineering

SPK Engineering

SPK Engineering SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering



Image 2-3
Image 4-5


Cost: $3 million
Client: PennDOT Engineering District 9-0
Contact: Ms. Monica Farabaugh (814-696-7160)

Cypher Bridge Rehabilitation - This project includes the rehabilitation of a two span steel historic truss
over the Raystown Branch of the Juniata River and a cast-in-place concrete rigid frame replacement structure
(24'-0" span) over Pipers Run. The project also includes 1,338' of approach roadway reconstruction.

BACK