Cost: $2.7 Million
Client: PennDOT Engineering District 12-0


Meadow Run Bridge Replacement and Roadway Improvements - This project included a Three-Span Continuous Composite
Prestressed Concrete Bridge. It also included 1,000 feet of roadway approach and a connection to existing S.R. 2019. The
structure was constructed in half-widths so as to maintain traffic at all times.