Links - SPK Engineering Careers - SPK Engineering Contacts - SPK Engineering Staff - SPK Engineering Design - SPK Engineering About - SPK Engineering Home - SPK Engineering
SPK Engineering

SPK Engineering

SPK Engineering SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering



More Images



Project Length: 2,076' (0.39 Miles)
Client: PennDOT Engineering District 12-0
Contact: Mr. Bill Oshnack (724-439-7321)

The project consisted of widening S.R. 0136, Section 137 from an existing two lane roadway to three lanes
from Davis Market to Greengate Road. This project also included the replacement of an existing metal plate
pipe arch which carries S.R. 0136 over the Tributary of Jack's Run. The replacement structure is a precast
concrete box culvert.

BACK