Links - SPK Engineering Careers - SPK Engineering Contacts - SPK Engineering Staff - SPK Engineering Design - SPK Engineering About - SPK Engineering Home - SPK Engineering
SPK Engineering

SPK Engineering

SPK Engineering SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering



More Images
More Images 2

Cost: $1.07 million
Project Length: 0.057 Mile
Client: PennDOT Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)

Paddy Run Bridge Replacement - This project includes a single span (51'-6"' c/c brgs.)
precast concrete spread box beam bridge over Paddy Run. The project also includes 450' of
approach roadway reconstruction.

BACK