![]() ![]() Cost: $23.0 Million Project Length - 10 Miles Client: PennDOT Engineering District 12-0 Roadway and Bridge Reconstruction - Greene and Washington Counties -This project included a Dual Single 63' Span Composite Prestressed Concrete Bridge carrying S.R. 0079 over T.R. 512; a Dual Three-Span (Overall Span Length 233') Continuous Composite Prestressed Concrete Bridge carrying S.R. 0079 over S.R. 2020 and Tenmile Creek; a Dual Three-Span (Overall span length 88') Continuous Composite Prestressed Concrete Bridge carrying S.R. 0079 over T.R. 357; and a Dual Single 156' Max. Span Composite Steel Bridge carrying S.R. 0079 over S.R. 0019. It also included the reconstruction of a Partial Cloverleaf Interchange between S.R. 0079 (I-79) with S.R. 2020. BACK |
||||||||||