Cost: $23.0 Million
Project Length - 10 Miles
Client: PennDOT Engineering District 12-0


Roadway and Bridge Reconstruction - Greene and Washington Counties -This project included a Dual Single
63' Span Composite Prestressed Concrete Bridge carrying S.R. 0079 over T.R. 512; a Dual Three-Span (Overall
Span Length 233') Continuous Composite Prestressed Concrete Bridge carrying S.R. 0079 over S.R. 2020 and
Tenmile Creek; a Dual Three-Span (Overall span length 88') Continuous Composite Prestressed Concrete Bridge
carrying S.R. 0079 over T.R. 357; and a Dual Single 156' Max. Span Composite Steel Bridge carrying S.R. 0079 over
S.R. 0019. It also included the reconstruction of a Partial Cloverleaf Interchange between S.R. 0079 (I-79) with S.R. 2020.