![]() ![]() ![]() Cost: $1.2 million Project Length: 2,475' (0.469 mile) Client:Client: PennDOT Engineering District 9-0 Contact: Mr. Dave Wolfhope, P.E. (814-696-7196) S.R. 0036, Sections 11S & 15B - Two (2) Culvert Replacements - This project included two (2) precast concrete box culverts; 10'-0" x 6'-6" and 10'-0" x 7'-6" for S.R. 0036, Section 11S over Dry Gap Run and S.R. 0036, Section 15B over a Tributary to Dry Gap Run respectively. The project also included a roadway reconstruction length of 2,595'. BACK |
||||||||||