![]() ![]() Cost: $1.5 million Project Length: 3,719' (0.704 mile) Client: PennDOT Engineering District 12-0 Contact: Mr. William Oshnack Roadway Construction - The project involved the widening of Route 30 in North Huntingdon Township to accommodate left turn lanes. Surface improvements and the replacement of two traffic signals at the Malts Lane intersection and the Lincoln Way intersection were also included with the project BACK |
||||||||||