![]() |
|
|||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
||||||||||
|
||||||||||
![]() ![]() More Images ![]() Cost: $26 million Project Length:6,005 Feet Client: PennDOT Engineering District 1-0 Contact: Ms. Jeanette Uhl, P.E. 814-678-7084 This project included 6,005' of new highway construction with three structures and railroad relocation. The two structures designed by SPK included a single span (82.66' c/c brgs.) prestressed concrete spread box beam bridge over S.R. 0020 (Broad Street) and a two span (184.86' overall span) prestressed concrete spread box beam bridge over S.R. 4034 and the tracks of Norfolk Southern Railroad. The project also includes four signals, highway lighting, and landscaping of the new corridor. BACK |
||||||||||