![]() ![]() Cost: $3.29 million Project Length:1,182 Feet Client: PennDOT Engineering District 12-0 Contact: Mr. Barry Lyons (724 439-7336) Bridge Replacement - The project included a three span (182’ - 2 ¾” c/c brgs.) precast concrete spread box beam bridge over Norfolk Southern’s dual track high-speed railroad. The project included approximately 1,000 feet of roadway relocation and reconstruction to accommodate required vertical clearances over the railroad as well as to maintain traffic throughout construction. BACK |
||||||||||