![]() |
|
|||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
|
|
|||||||||
|
||||||||||
|
||||||||||
![]() ![]() Cost: $0.84 Million Project Length: 559' Client: PennDOT Engineering District 2-0 Contact: Mr. Mark Kucherer, P.E. (814-765-0440) (Bridge Replacement) Bell Run Bridge - This project included a single span (59’-6” c/c brgs.) precast concrete spread box beam bridge with integral abutments. The project also included 500’ of approach roadway reconstruction. BACK |
||||||||||