Links - SPK Engineering Careers - SPK Engineering Contacts - SPK Engineering Staff - SPK Engineering Design - SPK Engineering About - SPK Engineering Home - SPK Engineering
SPK Engineering

SPK Engineering

SPK Engineering SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering

SPK Engineering



Cost: $0.84 Million
Project Length: 559'
Client: PennDOT Engineering District 2-0
Contact: Mr. Mark Kucherer, P.E. (814-765-0440)

(Bridge Replacement) Bell Run Bridge - This project included a single span (59’-6” c/c brgs.)
precast concrete spread box beam bridge with integral abutments. The project also included 500’
of approach roadway reconstruction.


BACK