![]() Cost: $1.87 Million Project Length: 0.317 Mile Client: PennDOT Engineering District 10-0 (Garretts Run) - Roadway Reconstruction and Structure Replacement - This project consisted of reconstruction of a Major Collector facility and three (3) single span (51.5’, 54.5’, & 47.0’ spans) Prestressed Concrete Spread Box Beam Bridges. Also included was the reconstruction of 0.07 mile of a Township Road. BACK |
||||||||||