Cost: $1.11 million
Client: PennDOT Engineering District 12-0
Contact: Mr. Jerry Bendo (724-439-7377)

Bridge Replacement - This project included the replacement of a single span thru-truss with a two span
(41.696 m overall span) prestressed concrete adjacent box beam bridge over Jacobs Creek. The project also
included 0.245 km of approach roadway reconstruction.