![]() ![]() ![]() Cost: $1.11 million Client: PennDOT Engineering District 12-0 Contact: Mr. Jerry Bendo (724-439-7377) Bridge Replacement - This project included the replacement of a single span thru-truss with a two span (41.696 m overall span) prestressed concrete adjacent box beam bridge over Jacobs Creek. The project also included 0.245 km of approach roadway reconstruction. BACK |
||||||||||